Barn Floor Pouring Quotes

Get Professional Services

Cost of Barn Floor Pouring in Dublin

Pouring a barn floor in Dublin, OH, involves several factors and tasks that influence the overall cost. Understanding these elements can help you budget accurately and plan your project effectively.

Factors Affecting Cost

  • Size of the Barn: Larger barns require more materials and labor.
  • Concrete Grade: Higher-grade concrete increases durability but comes at a higher cost.
  • Labor Rates: Local labor rates can vary, affecting the total cost.
  • Site Preparation: Costs for clearing and leveling the site.
  • Reinforcement Materials: Use of rebar or wire mesh for added strength.
  • Weather Conditions: Seasonal weather can impact labor efficiency and material costs.
  • Permits and Inspections: Local regulations may require permits and inspections, adding to the cost.

Average Costs for

Task Average Cost (Dublin, OH)
Site Preparation $1,500 - $3,000
Concrete (per cubic yard) $100 - $150
Labor (per hour) $50 - $75
Reinforcement Materials $0.10 - $0.30 per sq ft
Pouring and Finishing $2,000 - $5,000
Permits and Inspections $200 - $500

Barn Floor Pouring

Want This Site? Launch yours today